We have potted some shallots and placed them into the freshly lidded cold frame (still needs a bit of work on that!) We moved the remaining bags of topsoil, laid out some of the green plastic treads on the, getting quickly muddy, footpaths and repaired the shed door. You can see the builders fence which now runs the length of the plot. For future reference access to the site will soon only be from the playing field gate off the footpath that runs between Crowtree Lane and the Horncastle Rd.
The last job of the day was the engineering genius that
is the temporary rainwater harvester!
No comments:
Post a Comment
Leave your comments here